Our Projects

Under-Ground Distribution Tasks

  • installation of identification markers ,tagging and testing of insulation resistance and continuity and pre-commissioning tests.
  • Installation of grounding or earthing materials for various electrical equipment.
  • installation of riser assemblies of various configurations and voltages to integrate overhead and underground distribution systems.
  • Installation of customer service facilities including service cables and other equipment required to monitor power consumption.

Overhead Distribution Tasks

  • Installation, remove, replace and modify overhead distribution facilities for operating voltages up to 36 KV.
  • Installation of poles, including associated hardware to frame the poles in various configurations for distribution overhead networks in different types of soil.
  • Installation of grounding or earthing Sytem.
  • Installation of insulated and non-insulated conductors, wires or electric cables, joints and terminations for various voltages and configurations.
  • Installation of customer service facilities including service cables, meters, meter/ breaker cabinets, service boxes and other equipment to monitor electric power consumption.
  • Installation of pole mounted equipment including, but not limited to transformers, disconnects, capacitors, fuse boxes, cutouts, air break switches and voltage regulators.

SMART METER INSTALLATION PROJECT – VISION 2030

Al Rajhi Electricity Co. is working hand in hand with the nation towards the vision 2030. We have taken a good scope of Smart Meter Projects for the replacement of old mechanical meters with New Smart Meters  from Al

Material/Tools and Equipment

  • AL-Rrajhi Electric responsible for supplies of below given Material/Tools and equipment in case the client is not able to supply it.
  • Material included compact package/unit substations,switchgear, cables & terminations, transformers, steel pools, conductors, kilowatt-hour meters with accessories, pallets, steel cages, oil, number and danger monogram plates, cable markers , except asphalt, concrete, sand, gravel and other foundation, ready mix concrete, pavement tiles, curbstones cement for all civil work, cleaning material for cables splicing/termination, galvanized iron angles/channel sheet, gate, fence, louvers, wooden panels with plates and bolts